You can edit the details of any job material line on the Job Card Completion screen where the Type field shows Excess, Offcut, Seconds or Waste. If the Type field shows Prime, you can only edit the line if the Prime button was used to allocate materials; you cannot edit the line if the All button was used.
To edit a job line:
Refer to "Selecting the Customer Job Card to be Completed".
Micronet displays the allocation screen for the item.